Subsystem Testing Review (STR)

 

The Subsystem Testing Review (STR) is an interim review to show the progress that you have made since CDR.  The STR will also be used to show your final design, as many projects change design even after CDR. I will be using the updates given in the STR for the Design Review with Wallops, where final designs of the rocket and the payloads will be discussed.  Please address ALL of the items in the template!

The format of the review is the same as that for the CoDR, PDR, and CDR (presentation given via teleconference). All reports shall be submitted to This email address is being protected from spambots. You need JavaScript enabled to view it..

Your presentation should focus on the following elements:

  1. Mission Overview
  2. Final Desgin Description
  3. Program Management/Team Structure Updates
  4. Hardware Procurement States
  5. Report on the Current Status of Each Subsystem
  6. Projected Payload Completion Plan up to the Integrated Subsytem Report
  7. User Guide Compliance

 