Integrated Subsystem Testing Review (ISTR) 

**Note: This is the 2017 template. The 2018 version will be uploaded shortly**

Description:


The Integrated Subsystem Testing Review (ISTR) is an interim review designed to summarize the results of full system integration and testing. Integration of subsystems often reveals design flaws, so it is important to start integration and perform fit checks early to mitigate issues well in advance of delivery. Pending successful integration, testing of connected subsystems ensures that steps are being made in the direction of a full mission simulation. If interfaces or communication between subsystems fails at this point in the project, there is still time to resolve these issues. You will present the results of your integration and the plan to integrate your canister, which is particularly important for teams sharing canisters. All reports shall be submitted to your Dropbox folder no later than 24 hours before your discussed presentation teleconference time. Question and concerns can be emailed to This email address is being protected from spambots. You need JavaScript enabled to view it..

ISTR Template 2017

Go to top