Design Review (DR)

and

Individual Subsystem Testing Report (ISTR)

 

 

For RS-X 2013, I am combining details needed for the DR at Wallops in March with the ISTR review.  I am doing this because even after Post-CDR, I still do not have a clear understanding of each team’s final design.  The purpose of the DR with Wallops is to capture the final design of both the rocket systems and the payloads (you) that are going to fly.  The purpose of the ISTR is for me to understand how much of your design is built and how much of your design is tested.  During RS-X 2012, each team had to complete a second ISTR before moving onto their Full System Test Review, where all subsystems have been tested and are now being tested together as a system.  This review is scheduled to take place around March 18th, one month after this review.  YOU MUST ADDRESS AND FOLLOW EVERY ASPECT OF THIS TEMPLATE DURING YOUR TEAM’S REVIEW THE WEEK OF FEBRUARY 18th.  PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS 

The format of the review is the same as that for the CoDR, PDR, and CDR (presentation given via teleconference). All reports shall be submitted to Chris Koehler at This email address is being protected from spambots. You need JavaScript enabled to view it. no later than February 18th, 2013 via Pony Express on DropBox. Teleconferences will be held that week.

Your presentation should focus on the following elements:

  1. Mission Overview
  2. Final Design Description
  3. Project Management Update
  4. Hardware Procurement Status
  5. Individual Subsystem Testing Results
  6. Full System Testing Plan
  7. User Guide Compliance

If you have questions regarding the RockSat Program in general, please email This email address is being protected from spambots. You need JavaScript enabled to view it..  The template for the presentation is posted below.


DR & ISTR Template 2013

 

Go to top