Subsystem Integration and Testing Report

(SITR)

 

Report Description: The Subsystem Integration and Testing Report (SITR) is an interim review designed to summarize the results of full system integration and testing. Integration of subsystems almost never goes as well as planned, so it is important to start integration and perform fit checks early to mitigate issues well in advance of delivery. Pending successful integration, testing of connected subsystems ensures that steps are being made in the direction of a full Day In The Life (DITL) test. If interfaces or communication between subsystems fails at this point in the project, there is still time to resolve these issues. The format of the review is a presentation that will be given via a teleconference with. All reports shall be submitted to Shawn at This email address is being protected from spambots. You need JavaScript enabled to view it. no later than TBD. Teleconferences will be held the following TBD.

Your presentation should focus on the following elements:

  1. Brief Payload Overview (for completeness)
  2. Interfaces and how well (or poorly) subsystems connected together into the full system
  3. LOTS of pictures of the integrated subsystems
  4. Descriptions of tests completed and a summary of the results
  5. Conclusions: What actions items came out of the integration and testing?

If you have questions regarding the RockSat Program in general, please visit the RockSat-X Website.


SITR Template 2013

Coming Soon

 

Go to top