Schedule

This schedule provides the dates for all deliverables and important deadlines for the 2014 RockSat-X program. This schedule is subject to change, and the last update was made: 03/13/14. Launch date is still being determined. Questions can be directed to Chris Koehler at: This email address is being protected from spambots. You need JavaScript enabled to view it.

 

RockSat-X 2013/2014 Schedule 

09/20/2013

Intent to Fly Forms (IFF) DUE

09/25/2013

Initial Down Selections Made/Welcome Letters Sent

10/14/2013

Conceptual Design Review (CoDR) Slides DUE

10/15/2012

Conceptual Design Review (CoDR) Teleconferences

10/18/2013

Earnest Deposit of $2,000 DUE

11/04/2013

Preliminary Design Review (PDR) Slides DUE

11/05/2013

Preliminary Design Review (PDR) Teleconferences

12/02/2013

Critical Design Review (CDR) Slides DUE

12/03/2013

Critical Design Review (CDR) Teleconferences

12/06/2013

Post CDR Action Item Generation

01/17/2014

Final Down Select—Flights Awarded

01/27/2014

Post CDR Action Item Review

02/17/2014

First Installment Due

02/17/2014

Subsystem Testing Review (STR) Slides DUE

02/18/2013

Subsystem Testing Review (STR) Teleconferences

02/21/2014

Experiment Decks and Connectors Sent to Customers (in process)

04/07/2014

Integrated Subsystem Testing Review (ISTR) Slides DUE

04/07/2014

Integrated Subsystem Testing Review (ISTR) Teleconferences

04/08/2014

Final Installment Due

04/14/2014

Full Mission Simulation Review (FMSR) Slides DUE

04/15/2014

Full Mission Simulation Review (FMSR) Teleconferences

05/05/2014

Weekly Teleconferences Begin

05/12/2014

Weekly Teleconference #2

05/12/2014

Round 2 - Full Mission Simulation Review (FMSR) Slides DUE

05/13/2014

Round 2 - Full Mission Simulation Review (FMSR) Teleconferences

05/19/2014

Weekly Teleconference 3 (Procedure Walk-Through)

05/27/2014

Weekly Teleconference 4 (Travel Logistics)

06/02/2014

Weekly Teleconference 5 (Integration Readiness Review)

06/24/2014

GSE Checkouts At Refuge

06/25>29/2014

Testing and Environmental With Wallops

07/01/2014

Weekly Teleconferences Resume

07/21/2014

Launch Readiness Review Packages (LRR) DUE

07/22/2014

Launch Readiness Review Telecons with Wallops

08/05/2014

GSE Checkouts at Refuge Inn

08/06>12/2014

Final Integration at Wallops

08/12/2014

LAUNCH

08/13/2014

Contingency Launch

 

Indicates milestones completed

 

 

Contingency Launch