Subsystem Testing Review (STR) 

 Description:


 

The purpose of the STR is to show how much of the system has been built and tested and to demonstrate the functionality currently exists. This review aids with the DR at Wallops as it captures the final design of both the rocket systems and the payloads (you) that are going to fly.  YOU MUST ADDRESS AND FOLLOW EVERY ASPECT OF THIS TEMPLATE DURING YOUR TEAM’S REVIEW.  PLEASE CONTACT ME IF YOU HAVE ANY QUESTIONS.

The format of the review is the same as that for the CoDR, PDR, and CDR (presentation given via teleconference). All reports shall be submitted to Allison Howard at This email address is being protected from spambots. You need JavaScript enabled to view it..

Your presentation should focus on the following elements:

  1. Mission Overview
  2. Final Design Description
  3. Project Management Update
  4. Hardware Procurement Status
  5. Individual Subsystem Testing Results
  6. Full System Testing Plan
  7. User Guide Compliance

 


 

STR Template